Skip to main navigationSkip to sub navigationSkip to main content

SPIRou / Infrared SpectroPolarimeter

Photos

H4RG detector installation #1

H4RG detector installation #1

23/03/2018

Philippe Vallée (UdeM) and Gre...

H4RG detector installation #2

H4RG detector installation #2

23/03/2018

The new H4RG science-grade det...

H4RG detector installation #3

H4RG detector installation #3

23/03/2018

Wrapping the H4RG detector and dedicated FPA with...

Cassegrain unit - First light #1

Cassegrain unit - First light #1

20/03/2018

Saturn as viewed with the SPIR...

Cassegrain unit - First light #2

Cassegrain unit - First light #2

20/03/2018

Jupiter as viewed with the SPI...

Cassegrain unit - First light #3

Cassegrain unit - First light #3

20/03/2018

Sébastien Baratchart (IRAP/OMP) and Greg Barrick...

Cassegrain unit - First light #4

Cassegrain unit - First light #4

20/03/2018

Installing the control electronic rack next to th...

Cassegrain unit - First light #5

Cassegrain unit - First light #5

20/03/2018

The SPIRou Cassegrain unit and control electronic...

First Cryo-cycle completed #1

First Cryo-cycle completed #1

19/03/2018

Comparison between hollow-cathode frames taken at...

First Cryo-cycle completed #2

First Cryo-cycle completed #2

19/03/2018

The spectrograph bench following the first cryoge...

First Cryo-cycle completed #3

First Cryo-cycle completed #3

19/03/2018

The spectrograph bench following the first cryoge...

First cryogenic cycle at CFHT #1

First cryogenic cycle at CFHT #1

16/02/2018

Overview of the fully-integrated SPIRou spectrogr...

First cryogenic cycle at CFHT #2

First cryogenic cycle at CFHT #2

16/02/2018

Installing the active and passive shields over th...

First cryogenic cycle at CFHT #3

First cryogenic cycle at CFHT #3

16/02/2018

Closing the SPIRou vessel prior to the start of t...

First cryogenic cycle at CFHT #4

First cryogenic cycle at CFHT #4

16/02/2018

The Milky Way stretching from the distant lava fl...

First cryogenic cycle at CFHT #5

First cryogenic cycle at CFHT #5

16/02/2018

Starry night from the top of Maunakea, with the C...

First cryogenic cycle at CFHT #6

First cryogenic cycle at CFHT #6

16/02/2018

The SPIRou optical bench ready for the first cryo...

SPIRou comes back to life #1

SPIRou comes back to life #1

15/02/2018

Opening the SPIRou vessel following the first vac...

SPIRou comes back to life #2

SPIRou comes back to life #2

15/02/2018

Opening the SPIRou vessel following the first vac...

SPIRou comes back to life #3

SPIRou comes back to life #3

15/02/2018

Adjusting the multi-layer insulation inside the S...

SPIRou comes back to life #4

SPIRou comes back to life #4

15/02/2018

Installing the off-axis parabolic collimator on t...

SPIRou comes back to life #5

SPIRou comes back to life #5

15/02/2018

Fine tuning the position of the SPIRou off-axis p...

SPIRou comes back to life #6

SPIRou comes back to life #6

15/02/2018

Fine tuning the location and orientation of the p...

SPIRou comes back to life #7

SPIRou comes back to life #7

15/02/2018

Clamping the three SPIRou octagonal fibers of the...

SPIRou comes back to life #8

SPIRou comes back to life #8

15/02/2018

Focusing the SPIRou spectrograph by adjusting the...

SPIRou comes back to life #9

SPIRou comes back to life #9

15/02/2018

Focusing the SPIRou spectrograph by adjusting the...

SPIRou comes back to life #10

SPIRou comes back to life #10

15/02/2018

Installing the triple-prism cross-disperser on th...

SPIRou comes back to life #11

SPIRou comes back to life #11

15/02/2018

Installing the triple-prism cross-disperser on th...

SPIRou comes back to life #12

SPIRou comes back to life #12

15/02/2018

Installing the R2 echelle grating on the SPIRou o...

SPIRou comes back to life #13

SPIRou comes back to life #13

15/02/2018

Installing the R2 echelle grating on the SPIRou o...

SPIRou comes back to life #14

SPIRou comes back to life #14

15/02/2018

Overview of the SPIRou optical bench prior to the...

SPIRou comes back to life #15

SPIRou comes back to life #15

15/02/2018

Overview of the SPIRou optical bench prior to the...

SPIRou comes back to life #16

SPIRou comes back to life #16

15/02/2018

Installing the dioptric camera on the SPIRou opti...

SPIRou comes back to life #17

SPIRou comes back to life #17

15/02/2018

Installing the engineering H2RG detector at the f...

SPIRou comes back to life #18

SPIRou comes back to life #18

15/02/2018

Adjusting the rails of the SPIRou cryogenic vesse...

SPIRou comes back to life #19

SPIRou comes back to life #19

15/02/2018

Leaving the CFH Telescope after a tough working d...

SPIRou comes back to life #20

SPIRou comes back to life #20

15/02/2018

The SPIRou Cassegrain unit following reassembly a...

SPIRou comes back to life #21

SPIRou comes back to life #21

15/02/2018

Inner view of the upper Cassegrain unit (© S. Cha...

SPIRou comes back to life #22

SPIRou comes back to life #22

15/02/2018

Integrating and adjusting the SPIRou Calibration...

SPIRou comes back to life #23

SPIRou comes back to life #23

15/02/2018

Testing the hollow cathod lamps of the SPIRou Cal...

SPIRou atop Maunakea #1

SPIRou atop Maunakea #1

25/01/2018

The first three SPIRou crates reach CFHT atop Mau...

SPIRou atop Maunakea #2

SPIRou atop Maunakea #2

25/01/2018

The truck transporting the SPIRou crates enters t...

SPIRou atop Maunakea #3

SPIRou atop Maunakea #3

25/01/2018

The second load of SPIRou crates is delivered at...

SPIRou atop Maunakea #4

SPIRou atop Maunakea #4

25/01/2018

The first three SPIRou crates reach CFHT atop Mau...

SPIRou atop Maunakea #5

SPIRou atop Maunakea #5

25/01/2018

The first set of SPIRou crates is unloaded from t...

Good-bye Toulouse #1

Good-bye Toulouse #1

21/12/2017

SPIRou leaves IRAP/OMP (S.Chas...

Good-bye Toulouse #2

Good-bye Toulouse #2

21/12/2017

Loading the crates (©S.Chastan...

Good-bye Toulouse #3

Good-bye Toulouse #3

21/12/2017

Packing the spectrograph contr...

Good-bye Toulouse #4

Good-bye Toulouse #4

21/12/2017

Marking crates and installing...

Good-bye Toulouse #5

Good-bye Toulouse #5

21/12/2017

Closing crates (©D.Kouach - OM...

Good-bye Toulouse #6

Good-bye Toulouse #6

21/12/2017

Packing the spectrograph inter...

Good-bye Toulouse #7

Good-bye Toulouse #7

21/12/2017

The OHP team dismounting the c...

Good-bye Toulouse #8

Good-bye Toulouse #8

21/12/2017

Dismounting the prisms (©S.Cha...

Good-bye Toulouse #9

Good-bye Toulouse #9

21/12/2017

Removing the prisms assembly f...

Good-bye Toulouse #10

Good-bye Toulouse #10

21/12/2017

Packing the grating (©S.Chasta...

Good-bye Toulouse #11

Good-bye Toulouse #11

21/12/2017

Installing the grating cover (...

Good-bye Toulouse #12

Good-bye Toulouse #12

21/12/2017

Preparing the grating mount be...

Good-bye Toulouse #13

Good-bye Toulouse #13

21/12/2017

Removing the off-axis parabola...

Good-bye Toulouse #14

Good-bye Toulouse #14

21/12/2017

Referencing the fold mirror be...

Good-bye Toulouse #15

Good-bye Toulouse #15

21/12/2017

Packing the camera (©S.Chastan...

Good-bye Toulouse #16

Good-bye Toulouse #16

21/12/2017

Dismounting the Cassegrain uni...

Good-bye Toulouse #17

Good-bye Toulouse #17

21/12/2017

Last positioning verifications...

Good-bye Toulouse #18

Good-bye Toulouse #18

21/12/2017

Last alignment verifications b...

Good-bye Toulouse #19

Good-bye Toulouse #19

21/12/2017

SPIRou spectrograph bench befo...

Good-bye Toulouse #20

Good-bye Toulouse #20

21/12/2017

Last optical checks before dis...

Good-bye Toulouse #21

Good-bye Toulouse #21

21/12/2017

Last verification of the slice...

Good-bye Toulouse #22

Good-bye Toulouse #22

21/12/2017

Dismounting the Hartmann mecha...

Good-bye Toulouse #23

Good-bye Toulouse #23

21/12/2017

Removing the fibers from ...

Good-bye Toulouse #24

Good-bye Toulouse #24

21/12/2017

Preparation before removing th...

Good-bye Toulouse #25

Good-bye Toulouse #25

21/12/2017

Crating of the SPIRou spectrog...

SPIRou pre-shipping visits #1

SPIRou pre-shipping visits #1

08/12/2017

JY Duhoo from the SPIROU magaz...

SPIRou pre-shipping visits #2

SPIRou pre-shipping visits #2

08/12/2017

Driss Kouach details the main technical features...

SPIRou pre-shipping visits #3

SPIRou pre-shipping visits #3

07/12/2017

JF Donati outlines the main sc...

SPIRou goes to Hawaii #1

SPIRou goes to Hawaii #1

22/11/2017

The happy SPIRou team and panel members, after gr...

SPIRou goes to Hawaii #2

SPIRou goes to Hawaii #2

21/11/2017

The SPIRou team and panel members, including Andy...

SPIRou goes to Hawaii #3

SPIRou goes to Hawaii #3

21/11/2017

The Canada-France-Hawaii Telescope (CFHT) where S...

SPIRou performances validated #1

SPIRou validation #1

20/11/2017

The ISU plate and mechanism thanks to which the i...

SPIRou performances validated #2

SPIRou validation #2

19/11/2017

Opening the SPIRou spectrograph to improve the mu...

SPIRou stares at the Sun #1

SPIRou stares at the Sun #1

17/11/2017

The Sun as seen by SOHO (© ESA...

SPIRou stares at the Sun #2

SPIRou stares at the Sun #2

16/11/2017

Small portion of the infrared...

SPIRou stares at the Sun #3

SPIRou stares at the Sun #3

16/11/2017

An even smaller portion of the...

SPIRou stares at the Sun #4

SPIRou stares at the Sun #4

15/11/2017

The fluoride optical fiber mou...

SPIRou stares at the Sun #5

SPIRou stares at the Sun #5

14/11/2017

Sacha Foschino from the UPS-IN...

Second slicer #1

Second slicer #1

03/10/2017

Testing the pupil slicer on th...

Second slicer #2

Second slicer #2

02/10/2017

Internal view of the slicer mi...

Second slicer #3

Second slicer #3

29/09/2017

Light is injected through...

Second slicer #4

Second slicer #4

28/09/2017

The collimator re-image the b...

Second slicer #5

Second slicer #5

27/09/2017

The second SPIRou pupil slicer...

SPIRou validates key velocimetric requirement #1

SPIRou validates key velocimetri...

25/07/2017

Spectral lines of Fabry Perot...

SPIRou validates key velocimetric requirement #2

SPIRou validates key velocimetri...

24/07/2017

Drifts (in m/s) of the science spectrum with resp...

SPIRou validates key velocimetric requirement #3

SPIRou validates key velocimetri...

23/07/2017

Artist view of the 7 planets recently discovered...

Perfect focus for SPIRou #1

Perfect focus for SPIRou #1

30/06/2017

ThAr and Fabry Perot images se...

Perfect focus for SPIRou #2

Perfect focus for SPIRou #2

29/06/2017

Animated gif generated from F...

Perfect focus for SPIRou #3

Perfect focus for SPIRou #3

28/06/2017

Tiny portion of wavelength calibrated ThAr (green...

Second cryogenic cycle for SPIRou #1

Second cryogenic cycle for SPIRo...

23/05/2017

Spectrum of a Th-Ar hollow cat...

Second cryogenic cycle for SPIRou #2

Second cryogenic cycle for SPIRo...

22/05/2017

Comparison between images obtained in the first...

Second cryogenic cycle for SPIRou #3

Second cryogenic cycle for SPIRo...

22/05/2017

Bench temperature at mid distance from the 3 cont...

Second cryogenic cycle for SPIRou #4

Second cryogenic cycle for SPIRo...

21/05/2017

Close up views on SPIRou spectra, with the instru...

Tribute to Pierre Soler

Tribute to Pierre Soler

19/05/2017

SPIRou Final Design Review at...

Another cooling cycle in progress for SPIRou

Another cooling cycle in progres...

28/04/2017

The full spectrograph ready fo...

Another cooling cycle in progress for SPIRou #2

Another cooling cycle in progres...

31/03/2017

Temperature of the bench at mid distance from th...

First SPIRou Lab images #1

First SPIRou Lab images #1

30/03/2017

Zoom on a SPIRou spectrum of a...

First SPIRou Lab images #2

First SPIRou Lab images #2

30/03/2017

Zoom on a SPIRou spectrum of a Fabry-Perot calibr...

First SPIRou Lab images #3

First SPIRou Lab images #3

30/03/2017

Full size images of the two previous close-ups (©...

First SPIRou Lab images #4

First SPIRou Lab images #4

29/03/2017

Full size images prior to image processing (©IRAP...

First SPIRou Lab images #5

First SPIRou Lab images #5

29/03/2017

Zoom on a SPIRou spectrum of a...

Cooling Cycle 2 at IRAP/OMP #1

Cooling Cycle 2 at IRAP/OMP #1

26/03/2017

Closing the SPIRou cryogenic s...

Cooling cycle 2 at IRAP/OMP #2

Cooling cycle 2 at IRAP/OMP #2

25/03/2017

Cold straps and thermal probes bonded to the pris...

Cooling cycle 2 at IRAP/OMP #3

Cooling cycle 2 at IRAP/OMP #3

25/03/2017

Preparation and cleaning of the spectrograph prio...

Cooling cycle 2 at IRAP/OMP #4

Cooling cycle 2 at IRAP/OMP #4

24/03/2017

Crane-handling preparation of...

Cooling cycle 2 at IRAP/OMP #5

Cooling cycle 2 at IRAP/OMP #5

24/03/2017

Crane-handling of the active t...

Detector delivery #1

Detector delivery #1

23/03/2017

The H2RG test detector mounted...

Detector delivery #2

Detector delivery #2

22/03/2017

Installing the H2RG detec...

Detector delivery #3

Detector delivery #3

21/03/2017

Checking the detector electro...

Camera delivery #1

Camera delivery #1

01/03/2017

The spectrograph optics o...

Camera delivery #2

Camera delivery #2

28/02/2017

The camera on the SPIRou cryogenic bench (©S.Chas...

Camera delivery #3

Camera delivery #3

24/02/2017

Connecting the camera with thermal straps and tem...

Camera delivery #4

Camera delivery #4

21/02/2017

Installing the SPIRou camera on the optical bench...

Slicer delivery #1

Slicer delivery #1

10/02/2017

Internal view of the SPIRou pu...

Slicer delivery #2

Slicer delivery #2

09/02/2017

The 3 sets of 4 images (one...

Slicer delivery #3

Slicer delivery #3

08/02/2017

The pupil profile at the outpu...

Slicer delivery #4

Slicer delivery #4

07/02/2017

The slicer and dedicated mount...

Tribute to Les

Tribute to Les

23/01/2017

@IRAP/OMP during the SPIRou cryostat delivery

Spectrograph alignment 1

Spectrograph alignment 1

22/12/2016

Aligning the spectrograph optics on the SPIRou op...

Spectrograph alignment 2

Spectrograph alignment 2

22/12/2016

Overview of the SPIRou spectrograph in the alignm...

Spectrograph alignment 3

Spectrograph alignment 3

21/12/2016

R2 échelle grating (right) and triple-prism cross...

Spectrograph alignment 4

Spectrograph alignment 4

20/12/2016

Reference masks (left), prism...

Spectrograph alignment 5

Spectrograph alignment 5

13/12/2016

Reference mask with the pinholes on which the bea...

Spectrograph alignment 6

Spectrograph alignment 6

12/12/2016

The SPIRou spectrograph optical design
real...

Optics integration

Optics integration

11/11/2016

Integration of the prisms in their mount finaliz...

Optics integration

Optics integration

08/11/2016

Bonding of the pucks and flexures on the two ZnSe...

Optics integration

Optics integration

08/11/2016

The three prisms of the cross-disperser, integrat...

Optics integration

Optics integration

08/11/2016

The folding mirror integrated on its mount. Sever...

Optics integration

Optics integration

07/11/2016

Grating integration, with the mount set upside do...

Optics integration

Optics integration

07/11/2016

Bonding of the three sets of pucks & flexures...

The Cassegrain module

Cassegrain module alignment 3

03/11/2016

The Cassegrain module (©S.Bara...

Cassegrain module alignment 2

Cassegrain module alignment 2

02/11/2016

Optical alignment of the Cass...

Cassegrain module alignment 1

Cassegrain module alignment 1

01/11/2016

Overview of the image stabilis...

Cassegrain module alignment

Cassegrain module alignment

01/11/2016

One of the atmospheric dispersion corrector (ADC)...

Cooling cycle at IRAP/OMP 1

Cooling cycle at IRAP/OMP 1

21/10/2016

Parts of the cryostat cold heads
(©L.Saddle...

Cooling cycle at IRAP/OMP 2

Cooling cycle at IRAP/OMP 2

20/10/2016

View of the exapods under the optical bench

Cooling cycle at IRAP/OMP 3

Cooling cycle at IRAP/OMP 3

19/10/2016

View of the cold bus
(©L.Saddlemyer - NRC-H...

Cooling cycle at IRAP/OMP 4

Cooling cycle at IRAP/OMP 4

17/10/2016

The control command cabinet including the LakeSh...

Cooling cycle at IRAP/OMP 5

Cooling cycle at IRAP/OMP 5

17/10/2016

The two vacuum gauges fixed on the cryostat

Cryostat cooling

Cryostat cooling

16/10/2016

Cryostat in cooling phase at...

Cryostat cooling

Cryostat cooling

15/10/2016

Closing the cryostat dewar by translating the mo...

Cryostat cooling

Cryostat cooling

15/10/2016

The cryostat once fully assembled
(©SChasta...

Camera integration and tests

Camera integration and tests

14/10/2016

The science camera under integration and tests a...

Cryostat cooling

Cryostat cooling

14/10/2016

Connecting the primary vacuum pump
(©SChast...

Camera integration and Tests

Camera integration and tests

13/10/2016

Rear side of the science camera where the detect...

Camera integration and Tests

Camera integration and Tests

12/10/2016

Science camera mechanical assembly and mount

Spectrograph cryo-mechanics delivery 1

Spectrograph cryo-mechanics deli...

28/09/2016

Crates inside the truck

Spectrograph cryo-mechanics delivery 2

Spectrograph cryo-mechanics deli...

28/09/2016

Sensors checking
(©SCha...

Spectrograph cryo-mechanics delivery 3

Spectrograph cryo-mechanics deli...

28/09/2016

Overview of the crates at P2I...

Spectrograph cryo-mechanics delivery 4

Spectrograph cryo-mechanics deli...

28/09/2016

Crates opening
(©SChast...

Spectrograph cryo-mechanics delivery 5

Spectrograph cryo-mechanics deli...

28/09/2016

One of the vessel section unp...

Spectrograph cryo-mechanics delivery 6

Spectrograph cryo-mechanics deli...

28/09/2016

Installation of the first ves...

Spectrograph cryo-mechanics delivery 7

Spectrograph cryo-mechanics deli...

28/09/2016

Optical bench support frame u...

Spectrograph cryo-mechanics delivery 8

Spectrograph cryo-mechanics deli...

28/09/2016

Cryostat cover inspection and...

 Spectrograph cryo-mechanics delivery 9

Spectrograph cryo-mechanics del...

28/09/2016

Hermetic feedthroughs of the...

Spectrograph cryo-mechanics delivery 10

Spectrograph cryo-mechanics deli...

28/09/2016

Optical bench unpacking

Spectrograph cryo-mechanics delivery 11

Spectrograph cryo-mechanics deli...

28/09/2016

Cryostat installation inside...

Spectrograph cryo-mechanics delivery 12

Spectrograph cryo-mechanics deli...

28/09/2016

The optical bench covered wit...

Spectrograph cryo-mechanics delivery 13

Spectrograph cryo-mechanics deli...

28/09/2016

Optical bench assembly
...

Spectrograph cryo-mechanics delivery 14

Spectrograph cryo-mechanics deli...

28/09/2016

Complete cryostat installatio...

Spectrograph cryo-mechanics delivery 15

Spectrograph cryo-mechanics deli...

28/09/2016

Optical bench screwing on the...

Spectrograph cryo-mechanics delivery 16

Spectrograph cryo-mechanics deli...

28/09/2016

Cryostat installation control...

Spectrograph cryo-mechanics delivery 17

Spectrograph cryo-mechanics deli...

28/09/2016

Overview of the complete cryo...

Parabola metrology

Parabola metrology

03/09/2016

Alignment step on one of the parabola clear aper...

Parabola metrology

Parabola metrology

02/09/2016

Preparation of the metrology bench after Parabol...

Metrology on the Parabola before mounting

Parabola metrology

01/09/2016

Metrology on the Parabola before mounting
(...

Parabola mounted

Parabola mounted

25/08/2016

The Parabola integrated on its mount
(©ZCh...

Parabola gluing

Parabola gluing

24/08/2016

Bonding of the top flexure in Invar on the mount...

Parabola gluing

Parabola gluing

24/08/2016

The Invar flexure bonding using fishing-lines as...

Parabola mounting

Parabola mounting

23/08/2016

Parabola integration on its mount at LAM
(©...

Parabola gluing

Parabola gluing

22/08/2016

Zerodur pucks glued on the Parabola using a spec...

Calibration Unit Integration

Calibration Unit Integration

01/06/2016

Installation of the flat-field and hollow cathode...

OHP team

OHP team for integration of the...

01/06/2016

The OHP team in the P2IS control room following t...

Calibration Unit Integration

Calibration Unit Integration

26/05/2016

Assembly and integration of th...

Fiber test bench

Fiber test bench

27/04/2016

Fiber test bench at IRAP/OMP

Science fiber tests

Science fiber tests

27/04/2016

Testing one of the 35m SPIRou science fiber

Zerodur folding flat mirror

Zerodur folding flat mirror

06/04/2016

Visual inspection of the Zerodur folding flat mir...

ZnSe prism

ZnSe prism

05/04/2016

Visual inspection of one of the SPIRou ZnSe prism...

R2 échelle grating

R2 échelle grating

05/04/2016

The SPIRou R2 échelle grating in Zerodur on its t...

Measurement on the R2 échelle grating

Measurement on the R2 échelle gr...

05/04/2016

Wavefront error measurement of...

Fiber link section

Fiber link section

04/04/2016

The Cassegrain section of the...

Octagonal fibers

Octagonal fibers

04/04/2016

Octagonal fibers allowing high-enough scrambling...

ISU

Image Stabilization Unit (ISU)

15/03/2016

Image Stabilization Unit of the SPIRou Cassegrain...

ISU Tests

ISU Tests

15/03/2016

Lab tests of the Image Stabilization Unit in the...

Lower sections Cassegrain module

Lower sections of the Cassegrain...

15/03/2016

Integration of the lower sections of the Cassegra...

Dummy prisms

Dummy prisms

04/03/2016

Optical mount of the double-pass triple-prism SPI...

Optical bench

Optical bench

24/02/2016

Spectrograph optical bench mounted on the interna...

Spectrograph vessel / bench

Spectrograph vessel / bench

22/02/2016

Our cryomechanics expert Vlad Reshetov from NRC-H...

Internal Support Frame

Internal Support Frame

04/12/2015

The spectrograph internal support frame being int...

Cryostat

Cryostat

04/09/2015

The SPIRou cryostat and its support structure nex...

Cryostat

Cryostat

04/09/2015

External support frame (ESF) assembled and positi...

Cryostat

Cryostat

03/09/2015

Delivery of the cryostat

CAD View of the Prisms

CAD View of the Prisms

29/08/2015

CAD View of the prisms onto their support to form...

Infrasil Prism

Infrasil Prism

28/08/2015

The Infrasil SPIRou prism after AR coating

ZnSe Prisms

ZnSe Prisms

11/08/2015

The twin ZnSe SPIRou prisms before anti-reflectio...

Upper section of the Cassegrain module

Upper section of the Cassegrain...

11/06/2015

Integration of the upper section of the Cassegain...

Parabolic mirror

Parabolic mirror

01/06/2015

Control of the SPIRou 880mm-diameter parent parab...

CAD View of the parabola

CAD View of the parabola

01/06/2015

Front CAD view of the SPIRou parabola in its dedi...

CAD View of the parabola

CAD View of the parabola

01/06/2015

Back CAD view of the SPIRou parabola in its dedic...

Raptor Camera OWL 640

Raptor Camera OWL 640

10/04/2015

The SPIRou guiding camera is a commercial Raptor...

COMAT Team

COMAT Team

15/03/2015

The team of the supplier COMAT for the mechanical...

Optical bench

Optical bench

15/02/2015

Spectrograph optical bench at NRC, Ottawa.

Optical bench

Optical bench

15/02/2015

Zoom on the spectrograph optical bench at NRC, Ot...

Cassegrain Lower structure

Cassegrain Lower structure

09/01/2015

Lower structure - construction at Comat, France

Cassegrain Lower structure

Cassegrain Lower structure

09/01/2015

Lower structure - construction at Comat, France

Cassegrain Upper structure

Cassegrain Upper structure

07/01/2015

Upper structure - construction at Comat, France

Cold slot cell

Cold slot cell

15/12/2014

Cold source module prototype - side view

Science camera CAD

Science camera CAD

04/04/2014

3D Cross-section view of the camera (non ITAR ver...

Etalon mechanical assembly

Etalon mechanical assembly

Parabolas at each end are not yet mounted